Separate design draft 02 Handover & scope ↗
Ireland / County Kildare

Naas. The dossier.

The Herbata data centre. The people. The companies. The record.
Live updates and local action are with Sorcha O’Neill and Data Centre Awareness Kildare.

“The Herbata data centre is war infrastructure.”

alimcforever · The Herbata data centre
01 / CREDIT

Who is doing what

This is a collaboration. Each strand has a person or a group that owns it. Send readers there.

Sorcha O’Neill

Chairperson, Social Democrats · Former Naas & Kildare County Councillor · Naas resident since 2002

Sorcha O’Neill is chairperson of the Social Democrats and the elected political lead on the Naas data centre campaign. She mapped the Naas Local Area Plan, the P1 and P2 zonings, and organised the local response. The corporate-stack and JWCC/USAA threads in this archive build on the local research and campaign she is running.

Open her campaign page ↗

Data Centre Awareness Kildare

Community grassroots movement — residents across Kildare

The comms and community channel for the campaign. They run the graphics, the social feeds and the noticeboard of what is happening this week. For updates, meetings and shareable material, this is the destination — not alimcforever.

  • Sitedatacentreawarenesskildare.ie
  • MissionCommunity, education and grassroots action
  • AskMoratorium on new data centres in Kildare and Ireland until infrastructure and cumulative impact are properly assessed
  • AudienceResidents, councillors, media, national policy makers
Open the community site ↗

alimcforever

Journalist & decolonial educator — this archive

The written investigation and the corporate-stack thread live here as a static record. From today, live comms move to Data Centre Awareness Kildare and to Sorcha O’Neill. This site will not be updated after handover.

Handover date: 17 September 2026.

02 / ACT

Build your letter

Choose your role and recipient. Read the letter, add your details and copy it into your email. Nothing sends automatically.

Kildare County Council
0 words Edits stay here until you close or reload this page.
03 / TIMELINE

The record on one line

The planning and corporate chronology. Follow Sorcha O’Neill’s chronology for updates ↗

  1. 2015

    5% of Ireland’s electricity goes to data centres

    The baseline everyone starts from. CSO figures.

  2. 2020

    Herbata Limited incorporated · Prendergast on the Planning SPC

    Herbata Limited registered (CRO 669555, 9 April 2020). Gerry Prendergast holds the Business/Commercial seat on Kildare County Council’s Economic Development, Enterprise and Planning SPC while zoning is written.

  3. 2021

    Naas Local Area Plan adopted

    Public consultation 9 March – 21 April 2021. Plan period 2021–2027. Three data centre zonings clustered around the M7/R409 interchange.

  4. 2022

    Mission Critical E2 Limited incorporated at the same suite

    CRO 712860, 2 February 2022, Millennium Park, Naas. Prendergast is co-founder, director and company secretary alongside James and Jeanne Richmond.

  5. 2024

    Put and Call Option Agreement filed with the SEC

    9 April 2024. Herbata → Mission Critical / e2. Preference share structure documented: €4.17m from MIH Group Central UC, €833k from Daisymeadow Ltd (both Lisgrew, Emyvale).

  6. Aug 2025

    KCC grants permission for the Herbata site (P1) with 77 conditions

    Third parties and the developer both appeal. The developer does not appeal Condition 4 (full grid connection). Ecological conditions are the subject of the developer’s appeal.

  7. 2025

    Data centres reach 23% of Ireland’s electricity

    Up from 5% in 2015. Q4 2025 consumption: 1,991 GWh (CSO).

  8. 28 Jan 2026

    An Coimisiún Pleanála target decision date

    Case ACP-323677-25. The decision may confirm, vary or overturn KCC’s grant. Either way, the record above stays true.

  9. Ongoing

    P2 zoning — no application yet

    The second Naas zoning has no live application. Under the LAP process, residents can ask the Naas MD to vary the plan and remove the P — Data Centre zoning before an application arrives.

Check the appeal record and decision status ↗

04 / RECORD

Where the record lives

The published investigation, preserved case file and documents behind the letters.

05 / SCOPE

Handover & scope

What this page is

A design draft. A static record with a working letter builder. Reserved space for approved biographies and photographs supplied by Sorcha O’Neill and by Data Centre Awareness Kildare.

What this page is not

Not a news feed. Not a comms channel. Not a directory of names. Not updated after handover. For live campaign updates, follow the two collaborator sites at the top of the page.

Attribution

Local research and campaign organisation: Sorcha O’Neill. Community comms and moratorium ask: Data Centre Awareness Kildare. Corporate-stack investigation and archive: alimcforever.

Design draft — not for publication. alimcforever · 17 September 2026